Water Supply Upgrade For Wall Wetting Drencher System

  • Class 9b
  • Review maintenance logbooks for system
  • Inspection of and detailed report on the current condition of the exiting drencher system
  • Undertake hydraulic calculations
  • Fire Engineer Review
  • Provide remediation pathway
    • New tap in connection to Sydney water main
    • Hydrostatic testing existing pipework
    • Flow test existing supply
    • Reinstate system to AS2118.1
  • 12 Months DLP