Remediation of Stormwater System
- Commercial Class 7b
- Project was a 24-hour live site
- Stormwater Remedial
- Electronic Service locating (services marked on slab)
- CCTV Investigation & Report
- SJB identified failed RCP stormwater pipework below the operational facility (freezer and loading dock areas)
- SJB devised a sequence of works to allow staged access to the pipework below slab to maintain operation of the facility
- Structural assessment and slab scanning.
- Saw cutting, excavation and installation of new pits at up & downstream locations to allow relining was required.
- Fiberglass ultraviolet pipe relining of failed RCP pipes (110 lineal metres of 300 diameter pipe
- Concrete reinstatement
- Final CCTV review of remediated pipes
- 12months DLP
Have a project in mind?