Remediation of Stormwater System

  • Commercial Class 7b
  • Project was a 24-hour live site
  • Stormwater Remedial
  • Electronic Service locating (services marked on slab)
  • CCTV Investigation & Report
  • SJB identified failed RCP stormwater pipework below the operational facility (freezer and loading dock areas)
  • SJB devised a sequence of works to allow staged access to the pipework below slab to maintain operation of the facility
  • Structural assessment and slab scanning.
  • Saw cutting, excavation and installation of new pits at up & downstream locations to allow relining was required.
  • Fiberglass ultraviolet pipe relining of failed RCP pipes (110 lineal metres of 300 diameter pipe
  • Concrete reinstatement
  • Final CCTV review of remediated pipes
  • 12months DLP